How to document construction progress photos
The costliest site disputes are about work you can no longer see: services buried in plaster, rebar before the pour, insulation under fill. A photo taken that day, with its date proven, says far more than an inspection months later.
What to shoot, and when
- Before it is covered: rebar and cover before the pour, services before plaster, underfloor heating before screed, waterproofing before backfill.
- On payment days: an overview of the measured work and close-ups with a tape.
- At handover: room by room, with close-ups of defects and missing items.
- After damage or a stoppage: the moment it is found, weather, affected area.
Turning photos into proof
- Drop each day's or each stage's photos into the Handover pack on the File Proof page. The photos never leave your phone; only their fingerprints are anchored in Bitcoin.
- Add a short note: “Block B, 3rd floor slab rebar, before pour”.
- Email the pack list and the .ots file the same day to the client, supervisor or contractor.
- If needed, attach the pack's QR-coded PDF report to the payment application.
As an expert witness, what I most often find missing in files is exactly this: the state of the work on that day.
This does not replace the site diary, minutes or an official inspection; it strengthens them. It does not prove who took the photo or where, and it is not a notarisation.
Written by Gökhan Ertan, civil engineer and court-appointed expert witness.
Get a free proof Pick your photos; files never leave your phone, only their fingerprints are anchored in Bitcoin. 3 files a month free, checking always free.More guides
- Are WhatsApp photos valid evidence?
- Prove the state of your home before construction next door
- How to avoid car rental damage disputes
- A dated record of your home before a disaster
- How to do a move-out damage inspection
- Recording defects when you take over a new home
- How to prove a parcel arrived damaged or incomplete
- How to protect your rental deposit
- How to prove you created it first
- Proving a used car's condition at handover